25.07.2016

Transmission line connection to SPIDER vessel completed

 

 

 

 

 

 

 

 

 

 

 

  Part of the 35 metre long transmission line which is connected to the SPIDER vessel

 

For details please refer to:

http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1030

Go back